When can you file a Notice of Termination (NOT)?
A Notice of Termination (NOT) ends your construction stormwater permit coverage. Under EPA's 2022 CGP you may file it only after you finish construction and meet final stabilization with photographs, remove construction materials, temporary controls and pollutants, or after you transfer the site to another covered operator or move to another permit. File within 30 calendar days of meeting a condition, in EPA's NeT system. EPA 2022 CGP Part 8.2, 8.3, 8.4
National guide. The rules cited are from EPA's 2022 Construction General Permit (as modified in 2025), checked October 20, 2026, which applies where EPA is the permitting authority. Most states issue their own permit with different details; check your state before relying on a number.
Sources last checked October 19, 2026. Prepared by our team led by Mohamed Elansary, PhD, with AI research tools. We are not a licensed engineering firm and do not seal plans.
General information; your permit text controls. Not legal advice and not engineering judgment. We make no promise of permit coverage, agency acceptance or compliance.
Conditions for terminating (EPA 2022 CGP Part 8.2)
- Construction complete. All construction and support activities are done, and: disturbed areas you controlled that are not under permanent structures meet final stabilization; you took photographs before and after final stabilization, clear, in their original format, dated and described, and submit them with the NOT; construction materials, waste, equipment and vehicles are removed unless kept for long-term use; temporary stormwater controls are removed unless kept for long-term use or biodegradable; and potential pollutants are removed. EPA 2022 CGP Part 8.2.1
- Transfer. You transferred control of all your areas to another operator who has filed an NOI and obtained coverage. EPA 2022 CGP Part 8.2.2
- Other permit. You obtained coverage under an individual or alternative general permit. EPA 2022 CGP Part 8.2.3
Final vegetative stabilization means uniform, perennial vegetation providing 70 percent or more of the cover native to local undisturbed areas, or the equivalent non-vegetative measures. EPA 2022 CGP Part 2.2.14c
What the NOT contains
The NPDES ID from your coverage, the basis for termination, operator contact information, the site name and address (or a location description), and the NOT certification. EPA 2022 CGP Part 8.1
Deadline and effective date
Submit the NOT within 30 calendar days after a Part 8.2 condition occurs. EPA 2022 CGP Part 8.4 Coverage ends at midnight of the day a complete NOT is submitted. EPA 2022 CGP Part 8.5 Until then, every permit condition still applies. EPA 2022 CGP Part 8 File in NeT; paper NOTs need a Regional Office waiver. EPA 2022 CGP Part 8.3 Keep inspection reports for at least 3 years after coverage ends. EPA 2022 CGP Part 4.7.4
Texas: NOT for large sites, notice removal for small sites
| Texas site | How coverage ends |
|---|---|
| Large site, operator that filed an NOI | Submit an NOT in TCEQ ePermits within 30 days after final stabilization, a transfer of operational control, or alternative authorization, and send a copy to any MS4 operator receiving the discharge. TXR150000 Part II.F.1 |
| Small site, or secondary operator at a large site | Within 30 days of the same conditions, remove the site notice, complete its removal section and send a copy to the MS4 operator. The notice cannot come down before final stabilization. TXR150000 Part II.F.3 |
| Primary operator changes on a large site | The original operator submits an NOT at least 10 days before responsibility ends, and the new operator submits an NOI at least 10 days before the transfer. TXR150000 Part II.F.4 |
Other states set their own termination steps; see the hubs: Alaska, Arizona, Arkansas, Colorado, Florida, Hawaii, Idaho, Illinois, Indiana, Iowa, Kentucky, Louisiana, Massachusetts, Michigan, Mississippi, Nebraska, Nevada, New Hampshire, New York, North Dakota, Ohio, Oklahoma, Oregon, South Carolina, South Dakota, Texas, Utah, Washington, West Virginia. Our plans include the stabilization and termination steps for the permit that covers your site. You, the operator, file the NOT.
What this page does not cover
Industrial permit terminations, individual permits, and post-construction stormwater maintenance agreements that some cities require after construction.
Have it written for you
SWPPP Desk prepares site-specific SWPPPs from your drawings for construction sites in the states we cover (coverage by state), for a fixed price, delivered the next business day after your inputs are complete. Small site (1 to under 5 acres): $449. Large site (5 acres or more): $749. Background: all guides.
Related guides
- What is a SWP3?
- What is a SWPPP?
- SW3P, SWP3 and SWPPP: the same plan
- TCEQ SWPPP requirements
- TXR150000: the Texas construction general permit
- TCEQ stormwater permit for construction
- TCEQ NOI: filing in STEERS
- What goes in a SWPPP plan
- SWPPP template: EPA and state templates
- SWPPP inspection requirements
- SWPPP inspection form
- Erosion control plan requirements
- Who needs a SWPPP?
- Notice of Intent (NOI) for construction stormwater
- SWPPP sign and site notice
- Construction stormwater BMPs by type
- SWPPP cost: our prices and public prices
- PROPOSED 2027 EPA CGP: what re-filing looks like
- TXR150000 renewal: the permit expires March 5, 2028
- Silt fence installation
- Sediment basin requirements
- Concrete washout rules
- Construction dewatering
- SWPPP site map requirements