In North Dakota, construction stormwater coverage comes from NDPDES General Permit for Stormwater Discharges Associated with Construction Activities (permit no. NDR11-0000), issued by North Dakota Department of Environmental Quality (NDDEQ). It took effect April 1, 2025 and expires March 31, 2030.
At a glance
| Item | What the permit says |
|---|---|
| How coverage is obtained | Complete NOI plus a SWPPP per Part II(C); coverage effective 7 days after the NOI unless the department says otherwise (Part I(C)) |
| Agency fee | Not stated in the sources we checked. |
| Who may prepare the plan | No licence, seal or certification named for the SWPPP (Part II(C)) |
| Who inspects | Performed by or under the direction of the permittee (Part III(A)(2)) |
| Inspection frequency | At least every 14 calendar days and within 24 hours after more than 0.25 in of rain in 24 hours; monthly for areas meeting final cover criteria (Part III(A)) |
| State forms and templates | No mandatory state SWPPP template named in the permit |
Points that are easy to miss
- Keep a rain gauge on site or use the nearest NWS gauge (Part III(A)(2)).
- Coverage starts 7 days after a complete NOI (Part I(C)(2)).
What a SWPPP Desk plan covers here
We prepare a site-specific plan written to NDR11-0000, with each section mapped to the permit part it answers. You, the operator, review and sign it and keep it on site.
Checkout open in North Dakota. State ruling: Sell. The site check on the plan page applies these conditions before payment. See coverage.
What we do not do
- Our plans are not sealed or stamped. BMPs that need design calculations, such as sediment basins and post-construction practices, come from your design professional.
- The operator signs the plan and is responsible for it.
- We do not visit or inspect sites.
- We do not file the NOI or any permit application for you. We tell you which form and portal the permit names.