A SWP3 (stormwater pollution prevention plan) is the written plan TCEQ's Construction General Permit TXR150000 requires for construction that disturbs one acre or more, or is part of a larger common plan that will. It describes the site, the pollutants it could release, and the best management practices (BMPs) that will control them, and it must be prepared and put in place before soil is disturbed. TCEQ

Last reviewed October 19, 2026. Prepared by our team led by Mohamed Elansary, PhD. We are not a licensed engineering firm and do not seal plans. General information, not legal advice; the permit text controls.

When it is due

The SWP3 must be prepared before you obtain authorization under the permit and implemented before construction that disturbs soil begins. TXR150000 Part III.C TCEQ defines commencement of construction as the initial disturbance of soils from clearing, grading or excavation, or other construction-related activities such as demolition, grubbing, stockpiling fill or placing raw materials. TXR150000 Part I.B

Who needs one

Disturbed areaTCEQ classKey obligations
Under 1 acre, not part of a larger common plan of 1+ acresNot regulated by the CGPNo CGP coverage needed. TCEQ
1 to under 5 acres (or part of a common plan in that range)Small construction activitySWP3 before work; post Form 20963 at least 2 days before work; copy to MS4 operator 2 days before; no NOI. TXR150000 Part II.E.2
5 acres or more (or part of a 5+ acre common plan)Large construction activitySWP3 before coverage; primary operator files NOI in STEERS before work; post Form 20961 or 20962. TXR150000 Part II.E.3

What a SWP3 must contain

Part III.F of the permit lists the minimum contents. In summary:

TCEQ's free template, RG-639 (May 2023), organizes these into sections: general site information, schedule of major grading activities, acreage and soil type, location and site maps, support activities, authorization documents and certifications, BMPs and sediment controls, allowable non-stormwater discharges, inspection personnel, dewatering evaluations, inspections of all controls and adverse conditions. RG-639 contents

Where it is kept

The SWP3 is kept on site, or if the site is inactive or has no place to store it, a posted notice must say where it is. It must be readily available during an on-site inspection to TCEQ, local agencies that approve erosion or grading plans, local officials and the MS4 operator. If kept off site it should generally be available within 24 hours of a request. An electronic SWP3 is allowed if it is readable like paper, legally valid and immediately accessible to an inspector. TXR150000 Part III.D.1

Keeping it current

You must revise the SWP3, including the site map, within 7 days of a significant change in design or operations, changed site conditions (new plans, operators or BMPs), or inspection results showing it is not working. TXR150000 Part III.E

How long to keep records

Keep a copy of the SWP3, reports, the site notice and NOI data for at least 3 years from the date the NOT is submitted (or from when coverage ends for sites that do not file an NOT). TXR150000 Part VII

What this page does not cover

Industrial (multi-sector) stormwater permits, MS4 permits, city or county grading permits, and sites outside Texas. It does not replace reading TXR150000.

Have it written for you

SWPPP Desk prepares site-specific SWPPPs from your drawings for construction sites in the states we cover (coverage by state), for a fixed price, delivered the next business day after your inputs are complete. Small site (1 to under 5 acres): $449. Large site (5 acres or more): $749. Background: all guides.

Related guides