Home / Guides / SWPPP inspection form / Inspection form tool
Free tool
Free SWPPP inspection form: EPA CGP Part 4.7 report
General information, not legal advice; your permit text controls. SWPPP Desk does not inspect your site, and no person or engineer reviews this form. Using it does not by itself make a site compliant.
What you type stays in this browser tab. We do not receive or store it. Like every page on this site, we log the page visit. Print the report before you close the page. Dewatering inspection reports follow Part 4.6.3 instead.
Minimum frequency: once every 7 calendar days, or once every 14 calendar days and within 24 hours of a storm producing 0.25 inches or more of rain in 24 hours or a snowmelt discharge from 3.25 inches or more of snow in 24 hours, unless Part 4.3 (impaired or high-quality waters) or Part 4.4 (reductions) applies. Inspections are required only during normal working hours (EPA 2022 CGP Part 4.2 and footnote 67).
This form follows the EPA CGP. Texas sites under TXR150000 inspect at least every 14 calendar days and within 24 hours of the end of a storm of 0.5 inches or more (Part III.F.8(c)(i)), and must follow that permit's report rules. Other states: check your state permit.
Keep a copy of every report at the site or an easily accessible location and retain reports for at least 3 years from the date permit coverage expires or is terminated. EPA 2022 CGP Parts 4.7.3 and 4.7.4 See also SWPPP inspections.
Sources last checked October 22, 2026.