What goes into a SWPPP plan for a Texas construction site?

A Texas SWPPP plan (called a SWP3 by TCEQ) must describe the site and the work, map the drainage and controls, list potential pollutants, describe erosion, sediment and pollution prevention BMPs with their timing, and set out inspection and maintenance procedures. TXR150000 Part III.F sets the minimum contents. TXR150000 Part III.F

This is a general guide. It uses the Texas permit, TXR150000, as the worked example. Requirements differ by state: check the construction general permit that covers your site, or EPA 2022 CGP where EPA is the permitting authority.

Last reviewed October 19, 2026. Prepared by our team led by Mohamed Elansary, PhD. We are not a licensed engineering firm and do not seal plans. General information, not legal advice; the permit text controls.

Checklist of required contents

Site map items

The detailed site map(s) must show: property boundaries; drainage patterns and approximate slopes before and after major grading; areas of soil disturbance and phasing; locations of all controls and buffers; stabilization locations; construction support activities (including off-site); surface waters and wetlands at, adjacent to or near the site and whether they are impaired; discharge points to surface water or an MS4; vehicle wash areas; and vehicle exits onto paved roads. "Near" means receiving waters within the site and within one mile downstream. TXR150000 Part III.F.1(g)

BMP descriptions

Operations sections

Maintenance rules (including removing sediment before it reaches 50% of a silt fence's above-ground height or 50% of a trap's capacity), dewatering evaluations, inspection procedures and frequency, allowable non-stormwater discharges, and pollution prevention. TXR150000 Part III.F.6-11

Signatures

The operator signs the plan and certifications. If signatory authority is delegated, the delegation notice to TCEQ goes in the SWP3. TXR150000 Part III.F.1(l)

A practical order to assemble it

  1. Collect the civil, grading and erosion control sheets.
  2. Confirm acreage class and operators.
  3. Identify receiving waters and the MS4, and check impairment.
  4. Lay out BMPs on the map with install triggers.
  5. Write the sequence and tie BMPs to each phase.
  6. Set the inspection schedule and print the logs.
  7. Sign, post the site notice, and (large sites) file the NOI.

TCEQ's RG-639 template follows a similar order.

What this page does not cover

Engineering design of BMPs or sediment basins, local site development permits, and state rules other than Texas TXR150000.

Have it written for you

SWPPP Desk prepares site-specific SWPPPs from your drawings for construction sites in the states we cover (coverage by state), for a fixed price, delivered the next business day after your inputs are complete. Small site (1 to under 5 acres): $449. Large site (5 acres or more): $749. Background: all guides.